• Projects
  • Modification of six air treatment cabins - 2014

Turnkey sprayer installation - 2010

Installation carried out with two differentiated actions:

  • A first phase, where we travelled to England to dis-assemble a complete sprayer with all auxiliary equipment and all inter-connection pipes, as well as the entire electrical, automation and control installation.
  • A second action, where the entire spryer was implemented at the client's facilities, following the exact same layout it originally had in England. A new building had to be raised, and all electrical connections, automation and control carried out.