Turnkey boiler room modification installation - 2014
Installation consisting of modifying an existing boiler room made up of three diesel boilers by adding a new biomass boiler with all auxiliary elements necessary, such as a 25 m3 storage tank, pneumatic transportation to the boiler, connecting it to the existing one, a 10,000 litre holding tank connected to the entire installation, both the hot water and the heating installation. This improves the efficiency of the installation and prevents the diesel boilers from working at the pace they are now.