• Projects
  • Modification of six air treatment cabins - 2014

Steam boiler installation

The installation of an 8-bar steam boiler with a 2,500 kg per hour steam capacity. The manufacture and supply of the support structure and the auxiliary maintenance structure, the construction and installation of the gas train and conduit connection to the existing steam circuit with all interruption devices and necessary instrumentation.